Started: 10.06.2009.

Stage: painting and decorating works are being conducted

The performed works:

  • internal repair with re-planning of premises;
  • electroinstallation works;
  • the device and reconstruction of the entrance;
  • the device and installation of systems of ventilation;
  • facade reconstruction works .

Gross area of the site - 3500 m ².

Proect Manager: Baisov K.K.

 