Started: 10.06.2009.
Stage: painting and decorating works are being conducted
The performed works:
- internal repair with re-planning of premises;
- electroinstallation works;
- the device and reconstruction of the entrance;
- the device and installation of systems of ventilation;
- facade reconstruction works .
Gross area of the site - 3500 m ².
Proect Manager: Baisov K.K.
Feedback









