Construction start: November 20, 2003
Construction end: May 20, 2004

Works performed:

 

 

  • Internal repairs with alternation of premises;
  • Waterproof finish of premises;
  • Electric installation works;
  • Manufacturing and assembling of load lifts;
  • Installation of ventilation and air conditioning system, fire alarm system;
  • Site improvement;
  • Installation of entrance ramp from natural granite.
    Gross area of the site – 1,260 sqm

     