Construction start: December 15, 2005
Construction end: December 27, 2005
Within only two weeks we added gracefulness, uniqueness and style to office premises of Rational AG FRG due to some engineering solutions, as well as through installation of glass partitions and doors.
Works performed:
- Manufacturing and assembling of frame from aluminium profile of single filling painted with powder paint;
- Installation in the frame of transparent prestressed glass 6 mm thick and gypsum board with decorative coating “durafore”;
- Manufacturing and installation of doors and aluminium door profile of single filling with 6 mm thick glass;
- Installation of whole glass doors from 10 mm thick transparent prestressed glass with DORMA fitments.
Gross area of the site – 241.2 sqm
Feedback






