Starting Date: August 1, 2008
Completion Date: December 10, 2008
Initially, the aim of the project was a complete redesign facilities with the possibility of increasing the usable floor space. Thus, the floor structure, the height from floor to ceiling of 4.4 meters, was reconstructed in two-storied building, ground floor of which reaches a height of 2.2 meters and 2.05 meters in the top.
Completed works:
- Technical inspection;
- Dismantling premises with putting up loft;
- Finishing work;
- Remodeling premises;
- Engineering services;
Total area: 2 300 m ²
Feedback









