Starting Date: August 1, 2008

Completion Date: December 10, 2008

Initially, the aim of the project was a complete redesign facilities with the possibility of increasing the usable floor space. Thus, the floor structure, the height from floor to ceiling of 4.4 meters, was reconstructed in two-storied building, ground floor of which reaches a height of 2.2 meters and 2.05 meters in the top.

Completed works:
  • Technical inspection;
  • Dismantling premises with putting up loft;
  • Finishing work;
  • Remodeling premises;
  • Engineering services;
Total area: 2 300 m ²

 

 Feedback