Construction start: May 12, 2005
Construction end: August 10, 2005
During reconstruction of LinLine medical centre we used building materials, which have certificates of suitability for medical institutions of the 5th category. Our company prepared working draft, which was complied in all the respective organizations, including receipt of license for the site.


Works performed:

 

  • Disassembling and installation of flights of stairs;
  • alternation of premises without affecting the load-bearing walls;
  • Electric installation works with installation of new input panels;
  • Installation of drainage and water supply system for each reception room;
  • Installation of ventilation and air conditioning system and fire alarm system;
  • Installation of 2 sanitary facilities, assembling of glass partitions;
  • Organization of entrance and external advertising;
  • Preparation of design documentation followed by documentation compliance.


Gross area of the site – 154 sqm