The address; Noviy Arbat, 17

Construction start: 15.10.2009

Construction end: 25.07.2009 

The performed works:

  • Finishing works;
  • Engineering works;
  • Total construction works.

The gross area of the property: 260 sqm

Project manager: Baisov K.K.

 

Feedback