Construction of sports complex for horseback riding Manezh with administrative and ancillary unit in Moscow region.
The property represented uncompleted construction at the stage of initial cycle in terms of as-built documentation; after examination of technical condition of the structures there were carried out works aiming enhancement of the existing structures and installation of stiffening braces of riding hall frame; shape of the frame was subject to correction. There were performed works connected with installation of baulk; we erected ABV unit; currently roofing works are being performed and preparation for finishing works is underway.
Gross area of the site – 3,200 sqm
Works start: 16.12.2008
Works end: 27.05.2009
Project manager: V. Butovichev.

 

Feedback